From Planning to Building: How Long Does a Renovation Really Take in England?
Thinking about renovating your home this year? If you want to enjoy your new space before winter sets in, now is the time to act. One of the biggest misconceptions homeowners have is how long renovations actually take from the first idea to the final coat of paint.
In this post, we’ll break down the full timeline of a typical renovation in England, explain the key stages, and show you how starting in spring means finishing in time for winter comfort.
What’s the Typical Timeline for a Home Renovation in England?
Every project is unique, but here’s a realistic breakdown of how long a full renovation or extension typically takes:
- Initial Planning & Consultation – 1 to 2 weeks
- Architectural Drawings & Design Revisions – 2 to 4 weeks
- Planning Permission (if required) – 8 to 12 weeks
- Building Regulations & Structural Engineering Plans – 2 to 4 weeks
- Scope of Work Document – 2 weeks
- Contractor Quotes & Booking – 2 to 3 weeks
- Construction Phase – 8 to 20+ weeks depending on project size
👉 At GoPlans, we also offer a fast-track service for those who are under tighter deadlines where we complete your drawings at a much faster pace.
Why May Is the Ideal Time to Start
Planning your renovation in May offers several smart advantages:
✅ Better contractor availability before the summer/autumn rush
✅ Planning departments are often quicker to respond before peak holidays
✅ Spring weather helps speed up site prep and outdoor works
✅ You’ll be ready to build before colder, wetter months slow everything down
✅ Save money by purchasing fixtures, fittings, and materials now—many suppliers offer spring discounts, and early decisions help avoid expensive last-minute choices
✅ You gain time to plan carefully and avoid rushed, costly decisions during the build phase
Starting now means you’re building from a place of control—not pressure.
Step-by-Step: From Ideas to Finished Build
Here’s how your renovation journey typically unfolds with GoPlans:
1. Initial Concept & Planning Consultation (1–2 weeks)
We begin by understanding your vision and goals for the space. What are you trying to achieve? What’s your budget and timeline?
3. Architectural Drawings & Design Development (2–4 weeks)
Our designers turn your ideas into detailed architectural plans, refining layouts and making sure your project is feasible and compliant.
4. Planning Permission (8–12 weeks, if required)
Some projects can proceed under Permitted Development, but many need formal permission. We handle all paperwork and liaise with your local authority no matter what type of planning application your project requires.
5. Building Regulations & Structural Engineering (2–4 weeks)
Once plans are approved, we create technical drawings and structural calculations to ensure your build meets UK standards.
👉 Need this fast? Our GoPlans Fast-Track Service helps you move quicker to the next step.
2. Scope of Work (2 weeks)
This comprehensive document includes all architectural, structural, mechanical, electrical, and FF&F (fixtures, fittings & finishes) plans. It’s essential for obtaining accurate contractor quotes and avoiding budget surprises later.
6. Quotes & Contractor Selection (2–3 weeks)
We can assist you in gathering competitive quotes and selecting the right builder—early planning gives you access to better pricing and availability.
7. Construction Begins (8–20+ weeks)
Now the work begins! Depending on the size and scope, construction can take several months. By starting in spring, you dramatically reduce the risk of weather delays and winter slowdowns.
Common Delays (And How GoPlans Helps You Avoid Them)
Many delays in renovations come from poor preparation or unclear planning. Here’s how we help you avoid them:
- Incomplete or incorrect drawings → We handle all technical documentation in-house
- Slow council responses → We know how to submit clean, accurate applications
- Last-minute planning → Early decisions = better prices and less stress
- Contractor scheduling conflicts → Early start = better builder availability
Start Early, Finish Smart
Many homeowners start thinking seriously about renovations later in the year—but by that time, schedules are tighter, material costs may have risen, and the weather can introduce extra challenges. Starting earlier simply gives you more flexibility, better access to trades, and greater peace of mind as your project progresses.
At GoPlans, we help you go from vision to construction-ready with minimal friction and maximum speed if needed.